更新时间:01-06 上传会员:雨橙
分类:工程施工 论文字数:7427 需要金币:1000个
摘要:本毕业设计为XX学院行政楼投标文件编制。工程所在地为重庆沙坪坝区虎溪镇大学城。建设单位为重庆科技学院,该工程由重庆大学建筑设计研究院设计,施工图纸齐全,采用人工挖孔桩基础。上部主体为框支剪力墙结构,结构安全等级为二级,抗震设防烈度为六度,工程类别为二类,建筑面积9131.73平方米。
该投标文件是以XX学院行政楼的施工合同以及施工设计图纸,国家和地方现行的一系列施工和技术规范、标准;《重庆市建筑工程计价定额(2008))》,《重庆市建设工程费用定额2008》等为依据编制。
工程预算主要采用广联达软件算量,因为框支剪力墙结构,计算时先使用广联达钢筋软件计算钢筋工程量,后导入图形软件计算土建工程量,最后导入广联达计价软件进行价差调整,并得到最后工程造价结果。
在进行本工程预算的过程中,主要遇到的问题有广联达软件的操作问题,部分构件不知如何定义和布置,以及部分工程量应如何套定额等问题。在解决这些问题的工程中,除了自主翻阅G101图集和通过互联网收索相关知识,老师的指导和同学的关怀也提供了很大的帮助。让我在解决问题的过程中,不光了解到了更多的专业知识,还熟悉了工程造价的一般思路和自主学习的方法,让我能通过这次毕设设计的得到更大的提高。
关键词:投标 编制依据 工程量
ABSTRACT:This graduation design is the preparation of Chongqing city management college administration building bidding documents. The project is located in Huxi town Chongqing city Shapingba District university. Construction units for the Chongqing University of Science and Technology, this project was designed by the architectural design and Research Institute of Chongqing University, the construction drawings are complete, the artificial digging hole pile foundation. The upper part of the main for the frame-supported shear wall structure, structural safety grade two level, seismic fortification intensity is six degrees, the project categories into two categories, a building area of 9131.73 square meters.
The bidding documents in the construction contract administration building in Chongqing City Institute of management and construction design drawings, a series of construction and technical specifications, standards, the current state and local "quota valuation; Chongqing Construction Engineering (2008))", "Chongqing city construction project cost quota of 2008" as the basis of compiling.
The project budget by software calculation, because the frame-supported shear wall structure, the calculation used in reinforced steel project calculation software, the graphics software to calculate the amount of civil engineering, and finally into the enterprise valuation software for the price adjustment, and final results of Engineering cost.In the process of the project budget, the main problems encountered with operation software, components do not know how to define and layout, as well as part of the project should be how to set quotas and other problems. To solve these problems in the project, in addition to the independent reading G101 galleries and through the Internet search of knowledge, teachers and classmates care also provides a great help. Let me in the process of solving the problem, not only to understand the more professional knowledge, the method of general ideas and independent study project cost is familiar with, so that I can pass this graduation design gets better.
Keywords: Bidding Price; Calculating; Quantity.