更新时间:01-06 上传会员:雨橙
分类:工程施工 论文字数:8421 需要金币:1000个
摘要:本工程为XX大学新校区学生宿舍(东区)C组团工程I标段投标文件,所在地为重庆沙坪坝区虎溪镇大学城。该工程的建设单位为重庆市医科大学,工程由重庆大学建筑设计研究院设计,施工图纸齐全。基础结构采用人工挖孔桩基础。上部主体为框架结构,局部剪力墙结构,结构安全等级为二级,抗震设防烈度为六度,工程类别为四类。
该投标文件的编制是以XX大学新校区学生宿舍(东区)C组团工程I标段的施工合同以及施工设计图纸,国家和地方现行的一系列施工和技术规范、标准等为依据,该施工组织针对本工程的地方性及环境特点、工期要求,提出合理可行的保证措施加以重点阐述。
为了规范建筑市场促进其与国际接轨,形成企业竞争力,在经济上能有效控制巨额投资,在产品上能保证建筑产品的质量,国家进行了一系列的研究并颁布实施了相关的法规制度。而招投标中一个核心问题就是投标文件的编制。如何在激烈以及逐渐市场化和规范化的投标市场中中标,投标文件的好坏是重要前提。为此,我在分析了当今招投标的市场形式后,针对《XX大学新校区学生宿舍(东区)C组团工程I标段》项目,对其进行投标文件编制。通过编制投标文件来体会工程量定额计价的优势和作用。
关键词:工程概况 编制依据 投标 定额 工期
ABSTRACT:This works for the Chongqing Medical University staff hostels, Shapingba area of Chongqing is located in Tiger Town, University City. The project construction units for the Chongqing Medical University, engineering, architectural design by the Institute of Chongqing University, the design, construction drawings complete. Infrastructure, the use of hand-dug pile foundation. The upper part of the main for the brick, local framework structure, the structural safety of grade II, for the six seismic fortification intensity, type of construction work for the four categories.
The preparation of tender documents by the Chongqing Medical University staff hostels of the construction contract and construction design drawings, national and local construction and the existing series of technical specifications, standards-based, the construction for the local engineering and environmental characteristics, project requirements, to ensure reasonable and feasible measures to focus on. Adhere to the scientific order the capital program and construction, the use of sub-network technology, stratified flow process, a reasonable construction of the order of arrangement and construction plans to ensure that the construction schedule, the project construction period for the development of 190 calendar days.
Due to the volume of construction works bear a larger group of students for the new University City early arrival, our once successful, comprehensive scheduling the company's human, financial, and material, and actively promote the use of new technologies, new processes, new materials, new equipment, strict run in accordance with the ISO9002 quality system. Carry out the technical specifications of construction, and operation procedures, the implementation of total quality management. Careful organization, scientific management, to ensure that the commitments to achieve the goal.
Keywords: Project Overview;Prepared in accordance with;Tender;Successful measures.