更新时间:02-10 上传会员:单旅寂人
分类:工程科技 论文字数:5581 需要金币:500个
摘要:本工程为重庆科技学院大学城校区学生二食堂工程I标段投标文件,所在地为重庆沙坪坝区虎溪镇大学城。该工程的建设单位为重庆科技学院,工程由重庆大学建筑设计研究院设计,施工图纸齐全。基础结构采用人工挖孔桩基础。主体为剪力墙结构,结构安全等级为二级,抗震设防烈度为六度,工程类别为三类。手算首层钢筋以及混凝土工程量,广联达软件计算全部。
该投标文件的编制是以重庆科技学院大学城校区学生二食堂工程I标段的施工合同以及施工设计图纸,国家和地方现行的一系列施工和技术规范、标准等为依据,该施工组织针对本工程的地方性及环境特点、工期要求,提出合理可行的保证措施加以重点阐述。
由于工程量较大,为使新一批学生及早入住大学城,我方一旦中标,全面调度公司的人、财、物,积极推广应用新技术、新工艺、新材料、新设备,严格按照ISO9002质量体系运行。贯彻施工技术规范、操作规程,实施全面质量管理。精心组织、科学管理,确保实现各项承诺目标。
关键词:工程概况 编制依据 中标 措施
ABSTRACT:This engineering in chongqing institute of technology university town campus students second canteen project bid I bid documents, is located in chongqing shapingba district town of huxi university town. The project construction unit in chongqing institute of technology, engineering from chongqing university architecture design institute of design, construction drawings is complete. Infrastructure using mechanical digging hole pile foundation. Subject to shear wall structure, security level for the secondary structure, seismic fortification intensity is 6 degrees, engineering classes for the three categories. Hand is the first layer of steel bar and concrete quantity, GuangLian da software computing all of them.
The bidding documents compiling in chongqing institute of technology university city campus student second canteen I bid of construction contract and the construction design drawings, national and local current a series of construction and technical specifications, standards, and so on as the basis, the construction organization according to the local and environmental characteristics of this project and time limit for a project requirements and puts forward feasible guarantee measures emphasis on them.
Because the quantity is bigger, to make a new batch of students in university town as early as possible, once we won the bid, comprehensive dispatching company of people, goods, content, actively promote application of new technologies, new processes, new materials, new equipment, in strict accordance with the ISO9002 quality system running. To carry out the construction technical specification, operating rules, the implementation of total quality management. Elaborate organization and scientific management, to ensure that all the commitments to achieve goals.
Keywords: Project Overview;Prepared in accordance with;Successful measures.