更新时间:02-02 上传会员:单旅寂人
分类:工程科技 论文字数:7100 需要金币:500个
摘要:本工程为重庆城市管理学院学生宿舍A栋投标文件,所在地为重庆沙坪坝区虎溪镇大学城。该工程的建设单位为重庆科技学院,工程由重庆大学建筑设计研究院设计,施工图纸齐全。基础结构采用独立基础结构。主体为框剪结构,结构安全等级为二级,抗震等级为三级。耐火等级为二级,裂缝控制位三级,工程类别为三类。
该投标文件的编制是以重庆城市管理学院学生宿舍A栋的施工合同以及施工设计图纸,国家和地方现行的一系列施工和技术规范、标准等为依据,该施工组织针对本工程的地方性及环境特点、工期要求,提出合理可行的保证措施加以重点阐述。坚持科学的基本建设程序和施工顺序,运用网络技术分段、分层流水作业,合理安排施工顺序和施工计划,确保施工进度,本工程拟定工期为280个日历天。
由于工期紧工程量较大,为使新一批学生及早入住大学城,我方一旦中标,我们会做到抓进度,抓质量按时的并尽可能提前完成本工程,全面调度公司的人、财、物,积极推广应用新技术、新工艺、新材料、新设备,严格按照ISO9002质量体系运行。贯彻施工技术规范、操作规程,实施全面质量管理。精心组织、科学管理,确保实现各项承诺目标。
关键词:工程概况 编制依据 工期 措施 质量
ABSTRACT:This works for the Chongqing city management college student dormitory building A bidding documents, is located in Chongqing city Shapingba District Huxi town university. The project construction units for the Chongqing University of Science and Technology, engineering design by the architectural design and Research Institute of Chongqing University, the construction drawings are complete. Infrastructure is an independent foundation structure. The main frame structure,structural safety grade two level, seismic grade three. Refractory grade two level, three level of crack control, engineering category into three categories.
The preparation of the bidding documents to Chongqing city management college students dormitory construction contract A building and construction design drawings, the current state and local construction and a series of technical specification, standard as the basis, the construction organization for local and environmental characteristics, the project period, puts forward measures to ensure the reasonable and feasible to focus on. Adhere to the basic construction procedures and the construction sequence of science, using the technology of network segment, stratified flow, the reasonable arrangement of construction schedule and construction plan, ensure that the construction schedule, the project construction period for the development of 280 calendar days.
Because the time is tight in large quantities, in order to make a new batch of students early in the University City, I once successful, we will catch the progress, quality and on time as far as possible to complete the project ahead of schedule, comprehensive scheduling, people, money, materials, and actively promote the use of new technology, new technology, new materials, the new equipment, in strict accordance with the ISO9002 quality system operation. Carry out the technical specifications, operation rules of construction, the implementation of total quality management. Meticulous organization, scientific management, to ensure the implementation of the commitments.
Keywords: Project Overview;Prepared in accordance with;Successful measures.;quality.